Formwork system
PRIMAX telescopic beam formwork |
Contractor
August Spreng GmbH & Co. KG, Ingolstadt |
Construction details
Construction time: 3 storeys: Storey height: Total wall area: | 5 months of 14,000 m² each 3,28 m 8.000 m² |
Special features
4,050 m² reinforced concrete walls with fair-faced concrete quality SB 3 longLIFE formwork lining used approx. 30 times |