Column formwork during the construction of a machine hall, Retzstadt

PAX HD is erecting 16 concrete columns for a modern machine hall

The new machinery hall for May Agrarservice GmbH has been completed in Retzstadt, Franconia. It was constructed between October and December 2025 by the owner-operated construction company Konrad Bau from Himmelstadt. The PAX HD column formwork system from Mayer Schaltechnik was used for the project. The core of the structural framework consisted of 16 concrete columns with a cross-section of 40 x 40 cm, which support the hall’s roof. As early as the planning phase, the decision was made to use a system that combines proven construction methods with tested technology.

Formwork technology that delivers—even at a pouring height of 6 meters

PAX HD column formwork has been regarded for decades as exceptionally durable and dimensionally stable. These properties were already confirmed during the initial construction phases. Despite a pour height of 6 meters, no bleeding of the concrete was observed at the base of the columns. Especially at great heights, the system is subjected to considerable fresh concrete pressure, which is why a consistently tight seal is crucial. The fact that no cement slurry leaked out even under these conditions demonstrated the precise fit of the joints and eliminated the need for time-consuming rework on the eventual exposed surface.

Dimensionally Accurate Columns and Minimal Joint Formation: Concrete Pouring That Looks Like a Single Cast

Site Manager Stefan Edelmann offered a positive interim assessment: “We are very satisfied with how things have gone so far. The columns are perfectly straight, which was a key requirement for us to ensure the concrete could be poured in a single continuous pour. This approach not only minimizes the formation of joints but also increases the stability of the entire structure.” Eliminating construction joints ruled out potential weak points in the structural element from the outset. Foreman Dominik Buffe was also impressed by the formwork’s dimensional accuracy. Both factors were crucial for ensuring the hall’s long-term structural integrity.

 

 

The Synergy of Construction Experience and Formwork Technology

Konrad Bau brought both its many years of experience and state-of-the-art methods to the project. This synergy between a well-coordinated team and sophisticated technology formed a cornerstone of the project’s success. Close coordination between the construction team and the materials used ensured that structural integrity, the schedule, and cost-effectiveness remained in balance. In projects of this scale, it is precisely this integration of expertise and precisely tailored equipment that becomes a key factor in achieving a reliable result.

 

 

Economic Benefits and Strengthening the Region

With the completion of the new facility, May Agrarservice GmbH has significantly increased its efficiency while also creating new jobs. The investment in its own infrastructure is a clear commitment to the productivity of local agriculture. Expanded storage and operational capacities strengthen the company’s position and ensure value creation in the surrounding area. With its completion, the project demonstrates how strategically deployed technology and high-quality materials make a substantial contribution to rural development. As such, it serves as a model for similar projects.

 

 

Are you planning a similar project? With our PAX HD column formwork, you can count on durability, watertightness, and precision. Let’s talk about your project!

0

Let’s talk about your project!

We look forward to hearing from you!

Enquiry Form

We looking forward to hearing from you!

Enquiry Form

We looking forward to hearing from you!

Enquiry Form
Worldwide Sales

We look forward to hearing from you!

Customer Advisory Board Request to join

We look forward to hearing from you!