Underground garage, Darmstadt

Formwork system
PRIMAX - telescopic girder formwork

Construction execution
Trautmann GmbH, Sulzbach

Construction time
2 months

Construction details
  • underground garage with 2 floors
  • wall areas ca. 900 m²

Special characteristics
  • specified joint pattern
  • the walls for the 2 floors of the underground garage were concreted with 6.5 m high elements (basic element h=400 cm, telescoped at the top and bottom) in one work step.


 